All grants
NASASTTR Phase IIPractice listing

Low-Power Structural Vibration Monitoring

Use this practice listing to assess fit and draft a pitch.

Check AI Fit Score

Planning award

$850,000

Planning date

June 9, 2027

Program

STTR Phase II

Focus areas

3 categories

Plain-English summary

Advance a low-power sensor from controlled bench tests to a structural monitoring demonstration. Compare its sensitivity, calibration stability, and integration effort with reference instrumentation.

Eligibility checklist

  • Verify the qualifying NASA STTR Phase I award and the follow-on window
  • Document the research institution’s role in reference testing
  • Define a representative structure and access to measurement equipment

Red flags to resolve

  • Demonstrating a signal on one fixture without testing installation variability
  • Missing loss of synchronization in multi-sensor measurements
  • Ignoring how hardware is inspected or replaced during maintenance

Ready when you are

Browse current agency solicitations.

Visit official portal

SBIRPulse translates the opportunity for orientation. The official agency portal is the source of truth.