All grants
DOESBIR Phase IPractice listing

Industrial Heat Pump Control for Variable Loads

Use this practice listing to assess fit and draft a pitch.

Check AI Fit Score

Planning award

$200,000

Planning date

February 24, 2027

Program

SBIR Phase I

Focus areas

3 categories

Plain-English summary

Prove that a new control approach can reduce energy use in an industrial heat pump during variable production. Compare performance against standard controls at similar output and operating conditions.

Eligibility checklist

  • Verify the matching DOE topic and any required letter of intent
  • Identify a representative industrial load profile and an authorized data source
  • Meet the U.S. small-business and principal-investigator rules in the applicable notice

Red flags to resolve

  • Using steady-state efficiency to claim savings under variable production
  • Ignoring backup heating and integration constraints
  • Modeling plant economics with an unrepresentative tariff

Ready when you are

Browse current agency solicitations.

Visit official portal

SBIRPulse translates the opportunity for orientation. The official agency portal is the source of truth.