All grants
DOESTTR Phase IPractice listing

Self-Checking Sensors for Distribution Grid Monitoring

Use this practice listing to assess fit and draft a pitch.

Check AI Fit Score

Planning award

$200,000

Planning date

May 12, 2027

Program

STTR Phase I

Focus areas

3 categories

Plain-English summary

Test whether a distribution-grid sensor can identify its own calibration drift and report reliable measurements through temperature and load changes. Compare against a laboratory reference.

Eligibility checklist

  • Document the research institution and required STTR R&D work shares
  • Identify a representative measurement range and an available test facility
  • Check topic-specific submission and letter-of-intent requirements

Red flags to resolve

  • Using only nominal conditions during validation
  • Treating laboratory calibration as evidence of long-term field stability
  • Omitting practical installation and maintenance constraints

Ready when you are

Browse current agency solicitations.

Visit official portal

SBIRPulse translates the opportunity for orientation. The official agency portal is the source of truth.