All grants
DoDSBIR Phase IIPractice listing

Energy Analytics for Installation Facilities

Use this practice listing to assess fit and draft a pitch.

Planning award

$1,500,000

Planning date

April 21, 2027

Program

SBIR Phase II

Focus areas

3 categories

Plain-English summary

Advance a building energy analytics prototype into a multi-site pilot. Measure metered savings and operator workload while preserving existing building-system controls.

Eligibility checklist

  • Document the qualifying Phase I work or the applicable direct-to-Phase-II pathway
  • Name an authorized test facility and its integration point of contact
  • Budget for metering, baseline observation, and pilot evaluation

Red flags to resolve

  • Reporting modeled savings without metered verification
  • Assuming all sites share the same controls and data format
  • Leaving integration and operator training to the last milestone

Ready when you are

Browse current agency solicitations.

Visit official portal

SBIRPulse translates the opportunity for orientation. The official agency portal is the source of truth.